I was told that the asphalt for the main road will arrive the 25th of this month..
The work, which was done so far is the part that the power plant promised to do . The missing part (the asphalt) is supposed to be done by the local authorities.
We can only wait and see if they will do, what they promised!
Yesterday a huge truck was obstructing the University Road right at the school, because the space is too narrow for the trucks to turn at that spot.
It is so ridiculous that the main entrance road was closed with signs “desvio” for weeks, although nobody has been working at that street. All traffic is going through the University Street..